| - PLAN REVIEW FEES - |
| Fee includes plan review and two site inspections. If additional on-site inspections are required a fee of $150.00 will be charged for the third and subsequent inspection(s). |
| 1 |
Application Fee |
|
$50.00 |
| 2 |
New Building |
Minimum $350.00 |
.10 per sq. ft. |
| 3 |
Tenant Improvement |
Minimum $200.00 |
.07 per sq. ft. |
| 4 |
Site/Engineering Plan Check |
|
$150.00 |
| 5 |
Subdivision: Minor |
4 lots or less |
$120.00 |
| 6 |
Subdivision: Major Base Fee
|
5 to 24 lots |
$300.00 |
| |
6a: Additional per lot |
In excess of 24 lots |
$10.00 |
| 7 |
Fire Sprinkler System |
Under 25 heads |
$320.00 |
| |
7a: Additional sprinkler heads |
25 - 99 heads |
$400.00 |
| |
7b: Additional sprinkler heads |
100 or more heads |
$480.00 |
| |
7c: Additional sprinkler heads |
|
$1.00 per head |
| 8 |
Standpipe |
Per cabinet or riser |
$150.00 |
| 9 |
Fire Alarm System |
Base fee |
$200.00 |
| |
9a: Additional devices |
|
$2.00 per device |
| 10 |
Flow and tamper alarm plan check |
|
$200.00 |
| 11 |
Fixed Fire Protection System |
|
$150.00 |
| 12 |
Spray Booth |
|
$150.00 |
| 13 |
Hazardous Materials storage/dispense plan |
1-5 chemicals |
$200.00 |
| |
13a: Additional chemicals |
Every additional 5 chemicals |
$100.00 |
| 14 |
High Pile storage plan |
quare feet x .07 plus base |
$150.00 base fee |
| 15 |
Medical Gas System |
|
$200.00 |
| 16 |
Cryogenic Gas Tank |
|
$200.00 |
| 17 |
Liquified Petroleum Gas |
26-500 gal. |
$100.00 per tank |
| |
17a: Liquified Petroleum Gas |
501-2000 gal. |
$200.00 per tank |
| |
17ab Liquified Petroleum Gas |
2001 gal. or more |
$500.00 per tank |
| NOTE: If the plan(s) submitted for review are, in the opinion of the Fire Marshal, complicated or would take an excessive amount of time to review, he/she may submit such plans to an approved outside agency or person for review. In this event, the local plan review fee would not be collected, but the person submitting the plans would be responsible for paying the plan review fee. |
| - OCCUPANCY INSPECTION FEES - |
| A-1 |
$250.00 |
 |
I-1.1 |
$150.00 |
| A-2 |
$200.00 |
I-1.2 |
$150.00 |
| A-2.1 |
$200.00 |
I-2 |
$150.00 |
| A-3 |
$100.00 |
I-3 |
$200.00 |
| A-4 |
$100.00 |
M |
$150.00 |
| B |
$100.00 |
R-1 |
$100.00 (3-14 units) |
| E-1 |
$200.00 (private) |
R-1 |
$150.00 (15-99 units) |
| E-2 |
$150.00 (private) |
R-1 |
$200.00 (100-249 units) |
| E-3 |
$100.00 |
R-1 |
$250.00 (250 or more) |
| F-1 |
$150.00 |
R-2 |
$50.00 (0-25 occupants) |
| F-2 |
$150.00 |
R-2 |
$100.00 (26 or more occupants) |
| H-1 |
$200.00 |
R-3 |
$100.00 |
| H-2 |
$200.00 |
R-6 |
$50.00 (0-25 occupants) |
| H-3 |
$200.00 |
R-6 |
$100.00 (26 or more occupants) |
| H-4 |
$150.00 |
S-1 |
$150.00 |
| H-5 |
$200.00 |
S-2 |
$150.00 |
| H-6 |
$300.00 |
S-3 |
$150.00 |
| H-7 |
$500.00 |
S-4 |
$125.00 |
| H-8 |
$500.00 |
S-5 |
$200.00 |
| |
U-1 |
$100.00 |
| |
U-2 |
$100.00 |
| - PERMITS - |
| Aircraft Repair Hangers |
$200.00 |
| Candles and Open Flames |
$50.00 |
| Carnivals and Fairs |
$250.00 |
| Cryogens |
$150.00 |
| Fireworks |
$300.00 |
| Special Effects |
$250.00 |
| Explosives |
$200.00 |
| Flammable Liquid Storage Tank Removal |
$250.00 |
| Flammable Liquid Storage Tank Installation |
$150.00 |
| Liquefied Petroleum Gas (26-500 gals.) |
$100.00 |
| Liquified Petroleum Gas (501-2000 gals.) |
$150.00 |
| Liquefied Petroleum Gas 2001 gal. or more |
$200.00 |
| Liquified Petroleum Gas (2000 gals. and over) |
$200.00 |
| Paint Spray Booth |
$150.00 |
| Places of Assembly (A-1) |
$250.00 |
| Places of Assembly (A-2) |
$200.00 |
| Places of Assembly (A-2.1) |
$200.00 |
| Places of Assembly (A-3) |
$100.00 |
| Places of Assembly (A-4) |
$100.00 |
| Tents and Unsupported Structures |
$150.00 |
| Tire Storage - excess of 1,000 cu. ft. |
$250.00 |
| Other Required Permits UFC Section 105 |
$100.00 |
| - MISCELLANEOUS FEES - |
| 1 |
Appeals Fee |
$150.00 |
| 2 |
Building Inspection (2 hr min.) |
$80.00/hr. |
| 3 |
Design review/consultation (1/2 hr. min.) |
$40.00/hr. |
| 4 |
Expedite fee ($80.00/hr. per staff person) plus base |
$500.00 base fee |
| 5 |
False Alarm (3rd false alarm at the same location within any 30 day period) |
$500.00 |
| 6 |
File search (1/2 hr. min.) |
$40.00/hr |
| 7 |
Fire Hydrant Flow Test |
$100.00 |
| 8 |
Fire Investigation: Fee to be paid by individuals found through a CA State or U.S. Federal Court to have committed a crime resulting in a fire or an attempt to set a fire
| Engine |
$400.00 |
| Ladder Truck |
$400.00 |
| Audio Tapes |
$4.00 each |
| Video Tapes |
$6.00 each |
| Photographs |
$2.00 each |
| Personnel (Captain and above) |
$75.00 hr. |
| Personnel (below Captain) |
$50.00 hr. |
| Evidence Collection |
$5.00 per item |
|
| 9 |
Fire Watch Services
| Per Firefighter per hour (2 hour minimum) |
$50.00 |
| Per Apparatus per hour (2 hour minimum) |
$400.00 |
|
| 10 |
Inspections outside of normal business hrs. (2 hr min.) |
$120.00/hr. |
| 11 |
Knox application fee |
$30.00 |
| 12 |
Outside Consultants services |
$ Actual Cost |
| 13 |
Will serve/protection class letter |
$50.00 |